Spacious Two-Story ADU in Jefferson
Jefferson Area | December 15, 2023
This Jefferson ADU project exemplifies FTR Renovation’s expertise in managing large-scale constructions. It highlights our ability to combine functional design with aesthetic appeal, all while strictly adhering to timelines and budget constraints.
Completed Date
Project Budget
Project Duration
Erecting a two-story ADU with 3 bedrooms and 2 bathrooms.
Project Challenges
- Complex Structure: Building a two-story ADU within a relatively tight timeline.
- Budgeting for Scale: Managing a substantial $450,000 budget effectively to cover all aspects of a larger ADU.
- Maximizing Space: Ensuring that each bedroom and living area is spacious and well-appointed.
Objectives
- Construct a sizeable and comfortable two-story ADU.
- Achieve high-quality construction and finishes within the set budget.
- Complete the project within the ambitious 7-month timeframe.
Results
- Structural Excellence: Achieved a robust two-story build without any compromise on safety or design.
- Budget Efficiency: Effectively utilized the $450,000 budget, balancing costs with quality.
- On-Time Completion: Met the project deadline, delivering a fully functional ADU in 7 months.
Solutions & Strategy
Initial Planning:
Intensive sessions with the client to finalize a design that offers comfort and maximizes utility in each area of the ADU.
Construction Highlights:
- Bedrooms: Three well-designed bedrooms, each planned to optimize space and comfort.
- Bathrooms: Two modern bathrooms equipped with high-quality fixtures and finishes.
- Structural Integrity: Ensuring the two-story structure meets all safety and building standards.
Budget and Time Management:
Careful tracking of budget and progress to ensure project completion within the 7-month deadline.
“The team at FTR Renovation impressed us with their ability to handle such a large project efficiently. The end result is simply stunning – a spacious, modern ADU that perfectly fits our needs.”
-Jaylen K.