ADU Construction in Northridge, CA

Northridge, CA | June 26, 2024

FTR Renovation was commissioned to construct a spacious and modern ADU in Northridge, CA. The objective was to create an additional living space that offers the comfort and convenience of a full-sized home, catering to the needs of a growing family or serving as a rental property.

  • Completed Date

    June 26, 2024
  • Project Budget

    $350,000
  • Project Duration

    5 Months
  • Construction of a new Accessory Dwelling Unit (ADU) featuring 3 bedrooms and 3.5 bathrooms, designed to provide ample living space with modern amenities.

    Project Challenges

    • Space Planning: Efficiently designing the layout to ensure all 3 bedrooms and 3.5 bathrooms are spacious and functional.
    • Local Regulations: Navigating Northridge’s building codes and securing the necessary permits for ADU construction.
    • Timeline Management: Completing the construction within a 5-month timeframe while ensuring high-quality workmanship.

    Objectives

    • To construct a high-quality, 3-bedroom, 3.5-bathroom ADU that maximizes living space and functionality.
    • To ensure the ADU meets all local building codes and regulations.
    • To complete the project within the set 5-month timeline and $350,000 budget.

    Results

    • Spacious and Functional: The ADU provides ample living space with a well-thought-out layout that maximizes comfort and functionality.
    • Modern Design: Features a contemporary design with high-end finishes and modern amenities, enhancing the overall property value.
    • On-Time and On-Budget: Successfully completed the construction within the 5-month timeframe and adhered to the $350,000 budget, showcasing FTR Renovation’s efficiency and commitment to quality.

    Solutions & Strategy

    Design and Planning:

    Collaborated with architects and designers to develop a comprehensive plan that includes a modern layout, efficient use of space, and integration of high-end finishes and fixtures.

    Key Construction Areas:

    • Living Spaces: Designed open-concept living and dining areas to create a spacious and inviting environment.
    • Bedrooms: Ensured each of the 3 bedrooms is well-sized, with the master bedroom featuring an en-suite bathroom and walk-in closet.
    • Bathrooms: Included 3 full bathrooms and one half-bath, each equipped with modern fixtures and designed for comfort and convenience.
    • Kitchen: Built a state-of-the-art kitchen with energy-efficient appliances, ample storage, and high-quality countertops.
    • Outdoor Space: Created a small patio area to extend the living space outdoors.

    Compliance and Permits:

    Worked closely with local authorities to secure all necessary permits and ensured that all construction met Northridge’s building codes and regulations.

    Construction Process:

    • Foundation and Framing: Laid a strong foundation and framed the ADU with high-quality materials to ensure structural integrity.
    • Utility Installation: Installed all necessary plumbing, electrical, and HVAC systems to meet modern living standards.
    • Finishing Touches: Applied high-quality finishes, including flooring, paint, and fixtures, to create a polished, modern look.

    “FTR Renovation exceeded our expectations with the construction of our new ADU. Their professionalism, attention to detail, and dedication to quality resulted in a beautiful living space that perfectly meets our needs. We couldn’t be happier with the outcome.”